{"ok":true,"site":{"host":"dchub.cloud","url":"https://dchub.cloud/","type":"live","desc":"Where can a data center get power? DCPI scores markets daily, with live grid data. DC Hub Capacity Source: data-center capacity to buy or lease.","tools":[{"name":"search-datacenter-facilities","kind":"answer","impl":"imperative","description":"Search DC Hub’s live database covering a global data-center facility map by city, state, country, operator, or keyword. Returns facility name, operator, location, power (MW where known), and status. Use when the user asks which data centers exist somewhere or who operates them.","title":"Search data-center facilities","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"query":{"type":"string","description":"City, state, country, or operator to search, e.g. \"ashburn\", \"equinix\", \"ireland\""},"limit":{"type":"number","description":"Max results (1-25, default 10)"}},"required":["query"]},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"rank-datacenter-markets","kind":"answer","impl":"imperative","description":"Rank the best data-center markets right now from DC Hub’s live DCPI scoring (grid headroom, fiber, pipeline, pricing). Returns an ordered list with scores. Use when the user asks where to build, which markets lead, or how markets compare.","title":"Rank data-center markets","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"limit":{"type":"number","description":"How many top markets to return (1-25, default 10)"}}},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"get-datacenter-ma-deals","kind":"answer","impl":"imperative","description":"Get the latest data-center M&A transactions from DC Hub’s deal tracker (1,800+ deals): buyer, seller, value, MW, market, date. Anonymous and free viewers get a 3-row preview with value and MW masked (null, not zero); the response’s tier, note and upgrade_url say what is locked. Use when the user asks about recent acquisitions, who bought what, or deal activity.","title":"Recent data-center M&A deals","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"limit":{"type":"number","description":"Max deals to return (1-20, default 5)"}}},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"find-candidate-sites","kind":"answer","impl":"imperative","description":"Site Selection Canvas: ranks US markets for a data-center build by DC Hub’s Data Center Power Index (excess-power headroom, grid constraint, time-to-power) and returns a shortlist with BUILD / CAUTION / AVOID verdicts. Verdicts are free; the numeric scores behind them are tier-gated and the response says which fields are locked. Use when the user asks where to site a data center of a given size.","title":"Find candidate data-center markets","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"capacity_mw":{"type":"number","description":"Target capacity in MW, e.g. 100"},"region":{"type":"string","description":"US state code or ISO, e.g. \"TX\", \"ERCOT\", \"VA\""},"max_months":{"type":"number","description":"Deadline: max months to power"},"verdict":{"type":"string","enum":["BUILD,CAUTION","BUILD","ALL"],"description":"Verdicts to include (default \"BUILD,CAUTION\")"},"limit":{"type":"number","description":"Max markets (1-25, default 12)"}}},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"get-market-context","kind":"answer","impl":"imperative","description":"Context for one data-center market from DC Hub: facilities, operators, capacity and pipeline for the market, by slug. Use when the user asks about one named market. Some numeric fields are tier-gated; the response says which.","title":"Market context","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"slug":{"type":"string","description":"Market slug, lowercase-hyphenated, e.g. \"northern-virginia\", \"dallas\""}},"required":["slug"]},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"compare-datacenter-markets","kind":"act","impl":"imperative","description":"Compare 2-4 data-center markets side by side on DC Hub’s DCPI (verdict and, where the caller’s tier allows, excess-power, constraint and time-to-power scores). Pass market slugs. Use when the user asks which of several markets is better to build in.","title":"Compare data-center markets","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"slugs":{"type":"array","items":{"type":"string"},"minItems":2,"maxItems":4,"description":"Market slugs, e.g. [\"northern-virginia\",\"dallas\"]"}},"required":["slugs"]},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"get-energy-prices","kind":"answer","impl":"imperative","description":"US electricity price summary from DC Hub (industrial and average rates), optionally for one state and sector. Rates may be withheld for anonymous callers; the response says so. Use when the user asks what power costs.","title":"Energy prices","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"state":{"type":"string","description":"Two-letter US state code, e.g. \"VA\""},"sector":{"type":"string","enum":["all","industrial","commercial","residential"],"description":"Sector (default \"all\")"}}},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"get-hosting-capacity","kind":"answer","impl":"imperative","description":"Utility-published feeder hosting capacity from DC Hub. With no arguments returns the coverage list (which utilities publish a machine-readable hosting-capacity map). With a bbox returns feeders inside it. A utility absent from coverage has not published; that is not a statement about its capacity.","title":"Utility hosting capacity","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"bbox":{"type":"string","description":"Optional \"minLon,minLat,maxLon,maxLat\" (keep it small, e.g. a county)"},"limit":{"type":"number","description":"Max feeders with bbox (1-50, default 10)"}}},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"find-available-capacity","kind":"answer","impl":"imperative","description":"Capacity Source listings from DC Hub: available powered land, powered shells and colocation capacity, filtered by size and location. Returns listing cards; details open only for callers who have an identified account and accepted the terms (the response says what is locked). Read-only: this tool never contacts a provider.","title":"Find available capacity","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{"min_mw":{"type":"number","description":"Minimum available MW"},"region":{"type":"string","description":"e.g. \"north_america\""},"location":{"type":"string","description":"City or area, e.g. \"Dallas\""},"limit":{"type":"number","description":"Max listings (1-25, default 10)"}}},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"get-live-grid-scoreboard","kind":"answer","impl":"imperative","description":"Live scoreboard of 13 grid operators from DC Hub — PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, IESO, AESO, TVA, BPA, Hydro-Québec, Nord Pool — with average power price, grid-constraint score, excess-power score, time-to-power (months), and BUILD/CAUTION/AVOID market counts per ISO, refreshed every 15 minutes. Use when the user asks which grid is cheapest, greenest, most constrained, or best to build in right now.","title":"Live grid operator scoreboard","annotations":{"readOnlyHint":true,"untrustedContentHint":true},"inputSchema":{"type":"object","properties":{}},"hasHandler":true,"hasExecute":true,"__source":"spec","executable":true,"handlerField":"execute","page":"/","pages":["/","/site-selection","/grid-transition"]},{"name":"find-candidate-sites-form","kind":"answer","impl":"declarative","description":"Rank US data-center markets for a build by DC Hub's Data Center Power Index and return a shortlist with BUILD / CAUTION / AVOID verdicts. Read-only; verdicts are free, the scores behind them are tier-gated.","inputSchema":{"type":"object","properties":{"capacity_mw":{"type":"number","description":"100"},"region":{"type":"string","description":"e.g. TX, ERCOT, VA"},"max_months":{"type":"number","description":"24"},"verdict":{"type":"string","enum":["BUILD,CAUTION","BUILD","ALL"]}}},"__source":"spec","__declarative":true,"page":"/site-selection","pages":["/site-selection"]}],"category":"Productivity & Business","favicon":"/favicons/dchub.cloud.png","apiSurface":"spec","toolCount":11}}